Tag Archives: X-Info SMS suite

What is X-Info SMS suite?

X-Info SMS suite (Safety Management Study) is specifically designed to provide pipeline owners with a comprehensive system that can manage their tasks associated with the operation, maintenance, suspension of operation, decommissioning and abandonment of their pipelines. In addition, X-Info SMS suite also manages data relating to any proposed transmission pipeline asset projects AS2885 workflows, quality control and reporting.

Why use X-Info SMS suite?

Pipeline owners use X-Info SMS suite to gather, store, display and report on information pertaining to design, safety and operational related hazards that cause or are capable of causing loss of pipeline integrity associated with the pipeline infrastructure (as set out in AS2885).

  • New Assets – X-Info SMS suite can provide a full pipeline safety management study.
  • Operational Asset – Safety management study reviews (five year Workshop style review).
  • Change Management – Local adhoc reviews as necessary for specific issues, for example new crossings, excavations, new tie in points, change of location class (development.
How it works
Threat library

Uses pre-configured threats for common crossings. Add specific physical and procedural protections unique to your asset. Threats can be associated locations via point and section geometries. Non-location threats are also captured against the entire asset.

Actions

Assigns actions to field teams to complete – reminder emails automatically notify responsible parties.

Risk Assessment

Where a threat is identified as “credible” and failure is possible, the risk MUST be managed to ALARP (As Low as Reasonably Possible). X-Info SMS suite guides participants through an Initial Risk Assessment workflow and Residual Risk Assessment to reach ALARP.

Case study

Specific details have been removed for confidentiality purposes.

  • Three pipelines
    • Pipeline A – approx. 5km – 97 threats
    • Pipeline B – approx. 200 km – 552 threats
    • Pipeline C – approx. 5km – 61 threats
  • 456 crossings
  • 727 threats
  • 80 follow up actions
  • SMS workshop completed in 2 days.

Putting your pipeline Safety Management Study information in one place

“Transmission pipelines have long operational lives (in Australia the Roma to Brisbane is our oldest operating highpressure pipeline in excess of 49 years), the environments around them change over time as do personnel responsible for planning, designing, constructing, commissioning, operating, maintaining and decommissioning. These changes are likely to have effects on a pipeline. In the short term, change will be associated with increased construction activity and its associated risk, in the long term change may alter the risk profile of a pipeline. This is particularly true on the urban fringe of towns and cities, where population growth and housing pressures lead to increasing expansion of urban boundaries and the transformation of rural and semi-rural land into suburban and urban environments containing residential, commercial and industrial communities.”
‘Guideline for investigations of land use around pipelines to guide initial location classification under AS 2885’ (August 2014)

It is now 21 years since AS 2885.1-1997 was published with its ground breaking section SAFETY, developed to provide a methodology for the pipeline industry to demonstrate the safe design, and construction of high pressure transmission pipelines. The SAFETY process was renamed ‘SAFETY MANAGEMENT STUDY’ (SMS) in the 2007 revision of AS 2885.1. Now the greatest change guiding our way forward has been the relocation of all details of safety management to a new standard “AS2885.6 Part 6:2017 Pipeline safety management” with final comments recently submitted 10 August 2018.

Mipela GeoSolutions X-Info SMS suite is a configurable, out of the box solution to capture, manage, display and report for your AS2885 proposed and operating pipelines:

  • Design parameters
  • SMS Workshop attendance record(s)
  • Location Class and Secondary Class assessments including definition of high consequence areas
  • Show typical threats which correspond to the whole pipeline route and location specific threats (point and length)
  • Protective measures (both procedural and physical)
  • Display radiation contours in the event of full bore rupture
  • Risk evaluation
  • Actions captured in a workshop which would need to be completed in time
  • Integration with your businesses Asset, Dial Before Your Dig, Encroachment, GIS Services, Integrity and Lands Management systems for history of contact and previous surveys.

If you would like further information, please contact us at info@mipela. com.au or on 1300 807 770.

X-Info SMS suite – Safety Management Study

X-Info SMS suite is the latest offering by Mipela that is specifically designed to provide pipeline owners with a comprehensive system that can manage the Clients tasks associated with the operation, maintenance, suspension of operation, decommissioning and abandonment along with all their proposed transmission pipeline asset projects AS2885 workflows, quality control and reporting.

AS2885 requires Licensee Approval for Safety Management Studies. X-Info SMS suite ensures that Client’s key management personnel are fully informed of the operational risks associated with the operating assets. It is a commercial off the shelf (COTS) solution that gathers, stores, displays and reports on information pertaining to design, safety and operational related hazards that cause or are capable of causing loss of pipeline integrity associated with the pipeline infrastructure (as set out in AS2885).

X-Info SMS suite can provide a full pipeline safety management study (generally for new assets), safety management study reviews (generally a five year style review) and local adhoc reviews as necessary for specific issues.

Benefits

  • Updates and revises your pipelines Threat Libraries to maintain AS2885 compliance
  • Location analysis
  • Threats identification
  • External interference protection in accordance with AS2885 standard
  • Other threats and mitigation measures
  • Failure analysis
  • Risk evaluation
  • Reports and outstanding actions
  • Filing – numerous types of important data.