The Tasmanian Gas Pipeline (TGP) is the only pipeline supplying natural gas to Tasmania. It transports natural gas from Longford in Victoria, under Bass Strait, to Bell Bay in Tasmania.
The TGP asset is owned by Palisade, and Zinfra has operated, maintained and undertaken minor construction activities on the gas pipe for 14 years, since it was commissioned in 2002, under a field services agreement (FSA). Zinfra delivers a comprehensive range of engineering, operations, maintenance and construction services to the utility infrastructure sector nationally.
Zinfra has used Mipela software solutions for their operations and maintenance work since 2012, using X-Info Suite, consisting of X-Info Connect, X-Info Maps and the integration with Maintenance Connection for automated Dial Before You Dig responses, works management for third party crossings, and to manage communications with landholders along the pipelines.
By implementing the new X-Info Aware application, field workers can now collect data on site at third party crossing locations. Other field data collection tasks have been streamlined into X-Info Suite, allowing the decommission of their old data collection systems entirely. Zinfra can now also assign tasks to their crews in the field and undertake regular checks of the pipeline, based on work orders generated in Maintenance Connection, from both the air and ground to keep informed of issues affecting the pipeline’s operation in real time.
“Implementing X-Info Aware for Zinfra’s data capture – which includes cathodic protection, aerial patrols and pipeline faults – has improved not only our workflow and record keeping, but keeps us up to date with current technologies available. We also have other connections that are linked together, including DBYD and Landholder Database, as well as a live system which is very important for our employees to ensure they have the most up to date data when in the field.”
Graeme Bystersky
Works Coordinator
Zinfra/Tasmanian Gas Pipeline
“With Mipela’s suite of products we were able to tailor what we needed to deliver for our client. Over the past four years we have found a solution that not only meets our client’s needs but keeps our field employees up to date with live updates and work flows that save time, keep data current and easier to manage. When working with Mipela our team has found they have a “can do, nothing is a problem” attitude with continual improvement always at the front of their mind. It’s always a pleasure dealing with Mipela and I look forward to working on the next project with them.”
Matthew Stewart
Operator of the Tasmanian Gas Pipeline – Zinfra
X-Info SMS suite is the latest offering by Mipela that is specifically designed to provide pipeline owners with a comprehensive system that can manage the Clients tasks associated with the operation, maintenance, suspension of operation, decommissioning and abandonment along with all their proposed transmission pipeline asset projects AS2885 workflows, quality control and reporting.
AS2885 requires Licensee Approval for Safety Management Studies. X-Info SMS suite ensures that Client’s key management personnel are fully informed of the operational risks associated with the operating assets. It is a commercial off the shelf (COTS) solution that gathers, stores, displays and reports on information pertaining to design, safety and operational related hazards that cause or are capable of causing loss of pipeline integrity associated with the pipeline infrastructure (as set out in AS2885).
X-Info SMS suite can provide a full pipeline safety management study (generally for new assets), safety management study reviews (generally a five year style review) and local adhoc reviews as necessary for specific issues.
Benefits